If you know custom trailers, skid systems, or fabricated equipment will be part of your plans for 2027, you don’t need every dimension, drawing, or specification finalized to start the conversation with BT. In fact, you probably shouldn’t wait until you do.
Custom equipment takes time to get right, and the work starts well before steel reaches the shop floor. Engineering has to be scheduled, materials sourced, and production planned around the work already on the calendar. Depending on the project, decisions made months before fabrication begins can have a direct impact on when the finished equipment is ready to go to work.
That’s why BT is opening its 2027 production allocation reservations now. The goal is simple: give our customers a way to tell us what they see coming so we can start planning for it together.
You Don’t Need Every Answer to Get Started
One of the biggest misconceptions about planning custom equipment is that you need a finished set of drawings or specs before you can talk to a manufacturer. You don’t.
If you expect to need equipment in 2027, start with what you know. Tell us whether you’re planning for custom trailers, engineered skids, custom fabrication, or something a little harder to define. Give us an idea of how many units you may need, what the equipment needs to accomplish, and when you’d like to have it. That’s enough to have a useful conversation.
From there, our team can help work through the details. Maybe you know you’ll need 30 to 40 trailers but haven’t settled on the final configuration or you need a new piece of equipment that will require a custom skid, but engineering is still underway. You may know your operation has a fabrication need coming and you’re still determining exactly what that looks like. That’s the nature of custom work. Not everything is figured out in one day…and that’s okay with us! What matters most to our team is starting early enough to figure everything out the right way.

Your Delivery Date Is Really the End of the Schedule
When customers think about production planning, the first question is usually, “When do we need the equipment?” We also want to know, “When do we need to start making decisions to get it there?” BT is currently planning around approximately 120 days for steel and another 30 days for engineering on upcoming work. Actual lead times vary depending on the project, specifications, quantities, materials, and components involved, but those numbers show why planning ahead matters.
A custom trailer may require decisions around axle configuration, dimensions, load specifications, equipment integration, and operating requirements. A custom skid may require engineering around the equipment it supports, overall dimensions, loads, integration points, transportation, and how the finished system will be used in the field. Then there are the materials and purchased components themselves. They have schedules, too.
All of that has to come together before a finished trailer, skid, or fabrication project can leave our facility. If you know you need equipment during a particular quarter of 2027, working backward from that date gives everyone more room to make good decisions instead of rushed ones.
What Does a 2027 Reservation Actually Mean?
We want this part to be clear: reserving your 2027 allocation is not the same as placing an order. A reservation tells BT what you anticipate needing and gives your project priority on our 2027 planning calendar. There is no purchase commitment required to make a reservation, and you don’t need final specifications to submit one.
The process moves through three distinct steps.
First, reserve. Tell us what you’re planning, approximately how many units you expect to need, and your anticipated delivery window. This gives our team visibility into the work that may be coming and allows us to begin thinking through capacity, engineering, and material requirements.
Next, confirm. When you’re ready to move forward, submit your purchase order. Your production slot is officially locked when BT receives your PO. A reservation gives you priority on our planning calendar, but the reservation itself does not guarantee a production slot.
Then, lock in. Once BT receives the required down payment, your price is guaranteed. The down payment also allows us to move forward with purchasing materials against the project.
That distinction matters. A reservation helps us plan. A purchase order secures your place on the production schedule. A down payment locks in your price.

Why Can Pricing Change Between a Quote and a Purchase Order?
This is another reason early planning matters.
Custom equipment depends on steel, axles, suspensions, wheels and tires, electrical components, paint, and other materials and purchased components whose costs can change over time. When a project is being discussed months ahead of production, the price of those materials may be different by the time the customer is ready to place the order.
That’s why a reservation alone doesn’t guarantee pricing.
BT can begin planning around your anticipated needs, but pricing is guaranteed once the required down payment is received. That gives our team the ability to begin purchasing against the project rather than trying to predict what material and component costs will look like months down the road.
For customers planning larger fleet orders or highly customized equipment, having these conversations early can be especially helpful. More units usually mean more materials, more components, more engineering coordination, and more production time to account for.
We build custom equipment because our customers don’t always need what comes off the shelf. They need something built around the job. That means the process doesn’t always begin with a perfect drawing and every question answered. Sometimes it starts with a phone call and a pretty simple statement: “Here’s what we know we’re going to need next year.” That’s enough to get the conversation moving.
If custom trailers, engineered skid systems, or custom fabrication are part of your 2027 plans, tell us what you know now. We’ll talk through what still needs to be figured out, help map the work backward from your anticipated delivery window, and make sure you understand what needs to happen to move from planning to production.
You don’t need to place an order to start planning. But the earlier we understand what’s ahead, the better we can prepare to build it right.